Improving crossing at Bel-Air Phase 1&2
Following the accident in December 2020 and subsequent survey, the Transport Department proposes to improve the existing zebra crossing at Cyberport Road near Bel-Air Phase 1 & 2:
改善貝沙灣一二期對出斑馬線
2020年12月發生交通意外後,居民透過問卷調查表達了意見。運輸署現建議改善貝沙灣一二期對出斑馬線,措施如下(連結):
Following the accident in December 2020 and subsequent survey, the Transport Department proposes to improve the existing zebra crossing at Cyberport Road near Bel-Air Phase 1 & 2:
- Widening the traffic island by 0.5m
- Adding an additional beacon at the traffic island
- Adding lane markings to visually narrow each lane from 3.5m down to 3.3m
- Improving the illuminance of street lights near the crossing by 60% (completed)
改善貝沙灣一二期對出斑馬線
2020年12月發生交通意外後,居民透過問卷調查表達了意見。運輸署現建議改善貝沙灣一二期對出斑馬線,措施如下(連結):
- 擴闊安全島半米
- 於安全島增設一盞黃波燈
- 修改路面標記,每條行車線的闊度將由3.5米收窄至3.3米